DIRECTIONS
HOW TO FIND US

Hürth-Knapsack has been home to the chemical industrial park since 1907. To make sure you can find us without difficulty we have put together maps and instructions on how to reach us by car, truck, bus and rail.

Address

The address of the administration headquarters and central visitor reception is:

Chemiepark Knapsack
Industriestrasse 300
50354 Hürth

You will find the entrance to the Hürth works section here:

Chemiepark Knapsack
Werksteil Hürth / Zentrale LKW-Einfahrt
Industriestrasse 149
50354 Hürth

 

GPS coordinates

For the administration building in Hürth-Knapsack:

N 50.85 933 / O 6.84 508

For the entrance to the Hürth works section:

N 50.86 386 / O 6.87 180

Europe map
Europe map
Regional map
Regional map
Approach route headquarters
Approach route headquarters
Approach route Hürth
Approach route Hürth

Approach route for trucks

If you are arriving by truck, please follow the route given here). You will then reach the Chemiepark Knapsack quickly and directly. At the same time, you will be helping to reduce congestion on Luxemburger Straße in Hürth.

Approach route for trucks
Approach route for trucks

Arriving by bus and/or rail

You reach the Chemiepark Knapsack by taking the U-Bahn (underground train) line 18 to the stop "Hürth-Hermülheim", then continue on bus line 979 or take a dial-a-ride share taxi (by order only). You will find an exact description containing further information here:

Approach route public transport
Approach route public transport

Thomas Kuhlow

Leiter Kommunikation
Tel.: +49 22 33 48-65 70
Fax: +49 22 33 48-94 65 70

Sicher navigieren im CPK

Nutzen Sie unsere neue Navigations-App, um im Chemiepark Knapsack schnell und sicher Ihr Ziel zu finden. Hier finden Sie alle Informationen. 

A1/E37 - Rheinbrücke Leverkusen (Rhine-Bridge Leverkusen)

Since Juli 1, 2014 it s not allowed to cross the the Rhine-Bridge with vehicles heavier than 3,5 tons due to damages to the bridge. Learn more here.

ENERGY SUPPLY

The reliable and economical supply of sufficient energy is one of the most important prerequisites for the chemical industry. The chemical park operator InfraServ Knapsack provides the manufacturing companies with the necessary energies in the form of electricity and process steam.

The continuous main load of the energy supply is borne by the refuse-derived fuel (RDF) power plant of E.ON Energy from Waste, where up to 300,000 tons of refuse-derived fuel are thermally utilized every year. This service is complemented by the combined cycle gas turbine (CCGT) power plant of the Norwegian energy company Statkraft. With 800 MW of installed capacity it is one of the largest CCGT power plants in Germany. A further combined gas turbine power plant with capacity of 400 MW is currently under construction. The energy supply of the Chemiepark Knapsack is thus guaranteed, also at peak load time. 

ENERGY SUPPLY

The reliable and economical supply of sufficient energy is one of the most important prerequisites for the chemical industry. The chemical park operator InfraServ Knapsack provides the manufacturing companies with the necessary energies in the form of electricity and process steam.

The continuous main load of the energy supply is borne by the refuse-derived fuel (RDF) power plant of E.ON Energy from Waste, where up to 300,000 tons of refuse-derived fuel are thermally utilized every year. This service is complemented by the combined cycle gas turbine (CCGT) power plant of the Norwegian energy company Statkraft. With 800 MW of installed capacity it is one of the largest CCGT power plants in Germany. A further combined gas turbine power plant with capacity of 400 MW is currently under construction. The energy supply of the Chemiepark Knapsack is thus guaranteed, also at peak load time.